Ask for Quotation

Flexographic Platemaking System in Bangladesh — In-House Photopolymer Plates

  • Produce photopolymer flexo plates in-house in hours rather than days
  • Substantially lower cost per plate than trade-shop supply
  • Remake damaged or revised plates immediately without external delay
  • Complete workflow: exposure, wash-out, drying and finishing
  • Removes plate lead time as a constraint on job scheduling
  • Supports both label and flexible packaging plate production
  • Prominent Tec supplies installation, training and local service

Machine Specification

A3/S Profile A2/S Profile A1/S Profile
Max plate size mm 370×520 530×760 700×900
UVA exp. lamps 9x40W 10R L. 590 14x40W 10R L. 590 14x60W 10R L. 1200
Uvc lamps 10x15W L. 437 12x30W L. 894 11x36W L. 1200
Stainless steel tank lt. 27 50 110
Heater 600W 2x600W 3x600W
Electrical 230/400V 50/60HZ 230/400V 50/60HZ 230/400V 50/60HZ
Overall size (LxWxH) cm 77x101x120 106x108x120 45x126x120
Weight kg. 174 260 380

The case for bringing platemaking in-house

Flexo converters who outsource plates pay twice. There is the direct cost per plate, and there is the schedule cost — a day or more waiting for plates before a job can run, and the same wait again when a plate is damaged or artwork changes. For a converter running frequent new designs or many short runs, plate lead time becomes the constraint on how fast the business can turn work around.

Producing plates in-house changes both. Plate cost drops to materials plus a share of the machine, and turnaround goes from days to hours. The investment case is straightforward: count your outsourced plates per month, multiply by the price difference, and compare against the machine cost over three years. For converters above a moderate plate volume the payback is usually comfortable, and the schedule flexibility is worth more still.

Applications

Label converters and flexible packaging printers across Bangladesh use in-house platemaking to control plate cost and job scheduling. Converters running frequent new designs — cosmetics, food brands, promotional work — benefit most, because that is where outsourced plate lead time hurts most. Some converters also sell plate production as a service to smaller local printers, turning the machine into a revenue line.

The system supports plates for our full flexo press range including the Focus Centraflex, eFlex and Proflex SE. Converters buying a press and platemaking together can have both quoted and commissioned as one project by Prominent Tec.

The flexographic printing machine buying guide covers how plate preparation, press width and finishing requirements influence an equipment decision.

Frequently Asked Questions

How do I work out whether in-house platemaking pays back?

Count your outsourced plates per month and multiply by the difference between trade-shop price and in-house material cost. Compare that annual saving against the machine cost. Add the value of removing plate lead time from your scheduling, which is often the larger benefit.

What plate materials does it use?

Standard photopolymer plate material used in flexographic printing. Our sales team can advise on plate material supply alongside the machine so you have a reliable source.

How long does it take to make one plate?

Typically a few hours through the full cycle of exposure, wash-out, drying and finishing — against a day or more for external supply. Multiple plates process together in a batch.

Do I need special skills to operate it?

Basic platemaking skill, which is covered in the operator training included with installation. The process is methodical rather than difficult, but consistency in exposure and wash-out times matters for plate quality.

Can I make plates for presses from other manufacturers?

Yes — photopolymer plates are made to the specification your press requires, not to a single manufacturer’s standard. Confirm your press plate specifications with our technical team at quotation.

What is the delivery and installation timeline?

Typically 30–45 days from order confirmation to Chittagong port, plus 7–10 days for inland transport, installation, commissioning and operator training on the platemaking workflow.