Advanced High Temperature Industrial Heating Ovens Machine

Industrial High Temperature Ovens drying, curing and heat-setting of textile production. Applied extensively in the factories of Bangladesh in order to give consistency in finishing, quicker processing, and high-quality fabrics.

Model name

PT-C4

Payment Method

L/C at sight or T/T in advance

Min. Order

01

Warranty

12 Months.

Packaging

Standard Export Wooden Case

Category:
Description

Industrial High Temperature Ovens Specification 

Model Inner Size(W*DH) Outer Size(W*DH) Inner Temperature Cotton Insulation Voltage Power
PT-C4 1200*850*1550mm 1050*1720*2200mm 0-250℃ 80K*100mm 380V/14KW

Advantage & Features 

  1. Easy digital temperature control system
  2. Stainless steel or galvanized interior is durable.
  3. Hot air circulation of even heating.
  4. Efficient heating tubes that can be used over a long period.

Applications

Heat setting, fabric drying, curing, screen frame drying, thermal bonding.

Warranty & Delivery

Warranty & Delivery

Warranty Period: 12 Months (Shipping cost to be borne by customer)

Technical & After Sales Service: We provide installation, training, and ongoing support including service visits and 24/7 phone assistance to keep your machine running smoothly.

Delivery Time: 30–45 days (Estimated). For exact timing, please contact our sales team.

FAQs

Frequently Asked Questions 

What’s the PT-C4 used for?
Perfect for heat setting, DTF curing, and drying in textile, garment, and light industrial work—up to 250°C.

Is it energy efficient?
Yes! It’s built with efficient heating and insulation to help cut energy costs.

Is there after-sales support?
Most local suppliers offer setup, training, and basic support. Just confirm spare parts and technician availability.

How does it compare to other ovens?
It offers better temperature control and durability than many local models—great for heavy-duty use.

Can I customize it?
Yes, options like bigger chambers or conveyors are often available—talk to your supplier.

What power does it need?
A stable 380V three-phase power supply is required.

7. How long for delivery and setup?
Usually a few weeks for delivery. Setup is fast—check with your supplier for details.

Company Information

Prominent Tec Company Information